The Readiness Factor: Culture Before Change

Prepare the soil so new strategies actually take root.

Published

Big launches fail quietly long before kickoff. Not for lack of a plan—but for lack of readiness. Culture is the soil in which change grows or withers. If the soil is compacted (low trust, unclear purpose, overloaded teams), even the best-designed initiative struggles. If it’s aerated (clarity, psychological safety, working rhythms), adoption accelerates.

What “readiness” really means

Readiness is not enthusiasm for a slide deck. It’s the presence of enabling conditions that let people try, learn, and repeat the new way. Four cultural enablers show up again and again:

Leading indicators to check before launch

Five-step readiness scan (2 weeks)

  1. Stakeholder map: Who’s critical to adoption? Who’s impacted most?
  2. Micro-survey (5–7 Qs): Purpose clarity, safety, capacity, perceived risks.
  3. Interviews (6–10): Ask for specific moments of friction in the current way of working.
  4. Artifact review: Roadmaps, KPIs, meeting cadences, incentives—do they support the change?
  5. Synthesis: Readiness heatmap + three decisive actions to raise the floor.

Culture work to do before the kickoff

30-60-90 day adoption plan

Days 0–30: Land the narrative; rehearse the norms; chase quick wins that prove value.

Days 31–60: Expand pilots; measure cycle time to decision; track blocker resolution SLA.

Days 61–90: Tighten rhythms (demo/retro), prune meetings, and shift incentives to the new outcomes.

Common failure modes

Readiness isn’t a delay; it’s an accelerant. A few weeks tuning purpose, norms, and rhythms saves months of resistance management later.